Return to site

Design build construction process

broken image
broken image

The owner puts out a Request for Proposal (RFP) to solicit proposals from design-build teams. Designers remain a part of the process throughout the project and can continue to make changes as needed.ĭuring preconstruction, the owner will scope suitable sites and develop a rough design and budget.

broken image

Second, design-build can fast-track a project schedule to reduce the time it takes to complete.īecause design-build melds together the design and construction phases under a single contract, the construction team can begin work before all designs are finalized.

broken image